Artificial intelligence (AI) policy: ASHRAE prohibits the entry of content from any ASHRAE publication or related ASHRAE intellectual property (IP) into any AI tool, including but not limited to ChatGPT. Additionally, creating derivative works of ASHRAE IP using AI is also prohibited without express written permission from ASHRAE.

Close
logoShaping Tomorrow’s Built Environment Today

Interpretations for Standard 170-2017

Share This

NOTE: All documents linked from this page are in pdf_icon.png PDF-format.

pdf_icon.png Interpretation 170-2017-1 – April 3, 2019 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Table 7.1, regarding Sterilizer Equipment Room.)

pdf_icon.png Interpretation 170-2017-2 – June 25, 2019 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2013, Section 8, regarding application to outpatient facilities.)

pdf_icon.png Interpretation 170-2017-3 – June 25, 2019 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Sections 7, 8 and 9 and Tables 7.1, 8.1 and 9.1 regarding Outdoor ACH during Heating Mode.)

pdf_icon.png Interpretation 170-2017-4 – June 25, 2019 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 7.1 and Table 7.1, regarding system minimum outdoor air calculation.)

Interpretation 170-2017-5 – February 4, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 6.3.2.2, regarding exhaust discharge outlets.)

Interpretation 170-2017-6 – February 4, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 6.3.2.2, regarding exhaust discharge outlets from pharmacy hazardous-drug exhausted enclosures.)

Interpretation 170-2017-7 – February 4, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2013, Table 7.1 (repeated in Tables 8.1 and 9.1), regarding patient corridors.)

Interpretation 170-2017-8 – February 4, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2013, Section 7.1.a.6.i  and 7.1.a.6.ii (repeated in 8.1.a and 9.1.a), regarding system outdoor air calculation.)

Interpretation 170-2017-9 – February 4, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 7.4.1a and Note o to Table 7.1, regarding operating room maximum velocity of diffuser.)

pdf_icon.png Interpretation 170-2017-10 – July 15, 2020 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 6.5.3, regarding radiant heating systems.)

pdf_icon.png Interpretation 170-2017-11 – January 26, 2021 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017 and Addendum n, Tables 7.1and 9.1, regarding nonrefrigerated body-holding rooms.)

pdf_icon.png Interpretation 170-2017-12 – January 26, 2021 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 7.1a.1, Table 7.1 and Section 7.4.1, regarding pressurization scheme for operating rooms.)

pdf_icon.png Interpretation 170-2017-13 – June 27, 2022 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 8 and Table 8.1, regarding vacuum pump room ventilation.)

pdf_icon.png Interpretation 170-2017-14 – December 6, 2023 (Refers to the requirements in ANSI/ASHRAE/ASHE Standard 170-2017, Section 6.7.1 and Tables 7.1 and 8.1, regarding requirements for fully ducted return air or exhaust air systems in emergency department exam and treatment rooms.)

Close