Artificial intelligence (AI) policy: ASHRAE prohibits the entry of content from any ASHRAE publication or related ASHRAE intellectual property (IP) into any AI tool, including but not limited to ChatGPT. Additionally, creating derivative works of ASHRAE IP using AI is also prohibited without express written permission from ASHRAE.

Close
logoShaping Tomorrow’s Global Built Environment Today

Interpretations For Standard 90.1-1999

Share This

NOTE: All documents linked from this page are in pdf_icon.png  PDF-format.

pdf_icon.png Interpretation 90.1-1999-1 - February 4, 2000 (Ref. Section 9.3.2, relating to the exterior
lighting power allowance)

pdf_icon.png Interpretation 90.1-1999-2 - February 6, 2000 (Ref. Section 6.2.1, relating to the efficiency requirements for HVAC equipment)

pdf_icon.png Interpretation 90.1-1999-3 - February 6, 2000 (Ref. water heater requirements in Section 7.2.2 and Table 7.2.2)

pdf_icon.png Interpretation 90.1-1999-4 - February 6, 2000 (Ref. to the requirements presented in ASHRAE/IESNA Standard 90.1-1999, Section 9.3.1.2, Additional Interior Lighting Power.)

pdf_icon.png Interpretation 90.1-1999-5 - February 7, 2000 (Ref. Section 4.1.2.1, Additions to Existing Buildings, and Section 4.1.2.2, Alterations to Existing Buildings

pdf_icon.png Interpretation 90.1-1999-6 - February 6, 2000 (Ref. Section 11.4.2, Building Envelope (Energy Cost Budget Method)

pdf_icon.png Interpretation 90.1-1999-7 - June 25, 2001 (Ref. Section Section 5.2.3.4, Vestibules)

pdf_icon.png Interpretation 90.1-1999-8 - January 25, 2004 (Ref. the requirements presented in ANSI/ASHRAE/IESNA Standard 90.1-1999, Section 3.2 Definitions and Section 6.3.3 Air System Design and Control, specifically relating to the definition of fan system energy demand (or fan system power))

Close